Search
X
Sure

Products

查看全部分类
1/1
Number of views:
1000

Prefabricated data center

Retail price
0.0
Market price
0.0
Number of views:
1000
Product serial number
M001
Quantity
-
+
Stock:
0

The prefabricated data center improves the operating efficiency of the system as much as possible and reduces the overall PUE value of the system through in-depth design, equipment selection and control strategy optimization. Depending on the project site, when the system load rate is 250%, the PUE of the data center is designed as follows: Class A areas (Huilai. Tianjin, Gui'an, Beijing, and other areas with low hourly average dry bulb temperature throughout the year In 15℃ cities) annual average PUE≤1.15, limit PUE≤1.40; B-type areas (Yizheng, Nanjing, Shanghai, and other cities where the average global temperature is higher than 15℃ and lower than 20℃ throughout the year) annual average PUE≤1.20 , Limit PUE≤1.40; C-type areas (Chongqing, Changzhou, Shenzhen, and other cities with hourly average dry bulb temperature higher than 20℃ throughout the year) annual average PUE≤1.25, limit PUE≤1.40.

技术参数
产品描述
We could not find any corresponding parameters, please add them to the properties table

The prefabricated data center is an ultra-high-efficiency, fully-product data center that can be clustered and can be deployed in clusters, integrated delivery, and ultra-high-efficiency. The granularity from small to large depends on boxboxbox, block, building, and base. Several square warehouses form one, several, and several square warehouses form a set of modules and several modules. , Several modules, several modules combine with buildings to form a hangar, and several buildings form a park. The prefabricated data center architecture runs through multiple stages of design, procurement, delivery, acceptance, and operation. Therefore, the site should minimize the amount of construction work. Maximize more equipment integration work to be completed in the factory's square warehouse. Only the splicing between the square warehouses and the necessary equipment and pipeline connections are carried out on the project site. Through the optimization of the product, the on-site assembly, debugging, power transmission, testing, rectification and acceptance should be controlled within 3 months.

Previous
Next

Similar other products

Previous page
1
Back

Online service
-

Hotline :

+86(574)87908988

© 2021 Sendall All rights reserved.